Have a personal or library account? Click to login
Matrix of Risk Factors for Railway Construction Projects Cover

Matrix of Risk Factors for Railway Construction Projects

Open Access
|Nov 2021

References

  1. Anysz, H. (2017). Wykorzystanie sztucznych sieci neuronowych do oceny możliwości wystąpienia opóźnień w realizacji kontraktów budowlanych [Delays in construction contracts execution. The evaluation of the possibility of their occurrence with the use of artificial neural networks] (PhD thesis). Politechnika Warszawska, Warszawa.
  2. Cleland, D. L. & Ireland, L. R. (2002). Project Management. New York: McGraw-Hill Professional Publishing.
  3. Hastak, M., Lafayette, W., Univ, P., Halpin, D. & Wanegas, J. (1994). A Decision Support System for the Expansion of International Operations of A/E/C Firms. In K. Khozeimeh (Ed.), Computing in Civil Engineering: Proceedings of the First Congress Held in Conjunction with A/E/C Systems 94 (pp. 735–742). American Society of Civil Engineers.
  4. Kowalski, J. (2021). Harmonogramowanie inwestycji kolejowych w Polsce z uwzględnieniem ryzyka w trakcie ich realizacji [Scheduling railway investments in Poland, taking into account the risk during their implementation] (doctorial thesis). Szkoła Główna Gospodarstwa Wiejskiego w Warszawie, Warszawa.
  5. Kowalski, J. & Połoński, M. (2019). The method of planning the implementation of railway investments including risk. Archives of Civil Engineering, 65 (3), 45–59.10.2478/ace-2019-0033
  6. Kowalski, J., Połoński, M. & Lendo-Siwicka, M. (2019). Risk factors for delays in rail investments implemented in the Design & Build contracts. MATEC Web of Conferences, 262, 07007. https://doi.org/10.1051/matecconf/20192620700710.1051/matecconf/201926207007
  7. Linczowski, C. & Sobczyk, Z. (1996). Organizacja i planowanie w budownictwie. Częstochowa: Wydawnictwo Politechniki Częstochowskiej.
  8. Pfeffer, I. (1956). Insurance and Economic Theory. Chicago: Homewood.
  9. Połoński, M. (2015). Application of the work breakdown structure in determining cost buffers in construction schedules. Archives of Civil Engineering, 61 (1), 147–161.10.1515/ace-2015-0010
  10. Project Management Institute [PMI] (2013). A guide to the Project Management Body of Knowledge (PMBOK® guide). Project Management Institute.
  11. Regan, S. T. (2003). Risk Management Implementation and Analysis. International Transaction (CSC.10.1– –CSC.10.7). Association for the Advancement of Cost Engineering International.
  12. Skorupka, D. (2007). Metoda oceny ryzyka budowlanego (habilitation dissertation). Wojskowa Akademia Techniczna, Warszawa.
  13. Sørensen, J. B. (2019). FIDIC Yellow Book: A companion to the 2017 Plant & Design Build Contract. London: ICE Publishing.
  14. Willett, H. W. (1951). The Economic Theory of Risk Insurance. Philadelphia: University of Pensylwania Press.10.9783/9781512808995
  15. Woodward, J. F. (1997). Construction Project Management. London: Thomas Telford.
Language: English
Page range: 55 - 61
Submitted on: Jul 8, 2021
|
Accepted on: Aug 25, 2021
|
Published on: Nov 20, 2021
Published by: Sciendo
In partnership with: Paradigm Publishing Services
Publication frequency: 4 issues per year

© 2021 Jan Kowalski, Marzena Lendo-Siwicka, published by Sciendo
This work is licensed under the Creative Commons Attribution-NonCommercial 4.0 License.